<b id="w9hfh"><meter id="w9hfh"></meter></b>
<dl id="w9hfh"></dl>
  1. <thead id="w9hfh"></thead>
    <b id="w9hfh"></b>
      <cite id="w9hfh"><table id="w9hfh"></table></cite>
        Home | Simplified Chinese | Japanese | Korean
      English About Changzhou Mayor’s Mailbox Government Bulletin Latest News Laws and Regulations
      Railway loop line launched to facilitate integration of Yangtze River Delta
      Font:〖L M S

      The Yangtze River Delta, an economically vibrant region in China, saw the operation of its first railway loop line on Saturday, connecting the metropolis of Shanghai with major cities in the regional cluster.

      Coded G8388, the first train service on the loop railway was launched from the Shanghai Railway Station at 10:27 a.m. on Saturday. For a full loop, the train is scheduled to travel for eight hours and nine minutes on a track that extends more than 1,200 km.

      Along the loop line, Shanghai and the provincial capital cities of Nanjing, Hefei, and Hangzhou are all important transport hubs connected with the country's railway trunk lines. Dubbed a scenic line, the railway threads through picturesque cities such as Hangzhou, Suzhou, Wuxi, and Nanjing.

      Moreover, the routes of the G7206 and G7136 trains from Shanghai Hongqiao to Anqing have been adjusted, now passing through Changzhou Station and Qishuyan Station, reducing travel time to Huangshan West Station to just 3 hours and 10 minutes.

      The latest schedule adjustment saw Changzhou Railway Station add 21 new passenger services, with five new trains at Changzhou Station, one at Changzhou North Station, nine at Wujin Station, and six at Jintan Station. Additionally, the routes and numbers of 12 existing passenger trains have been modified. Post-adjustment, Changzhou Station now handles 349 trains, Changzhou North Station 145, Qishuyan Station 12, Wujin Station 56, and Jintan Station 51.

      The railway department reminds passengers that the third-quarter schedule will coincide with the summer schedule, which runs from July 1 to August 31. Additional temporary passenger services will be added based on demand. Travelers are advised to check the 12306.cn website, app, WeChat, or station announcements of China Railway for updates and to plan their journeys accordingly.








      掃一掃在手機(jī)打開當(dāng)前頁

       
      Sponsored by: General Office and Foreign Affairs Office of Changzhou Municipal People’s Government All rights reserved
      蘇公網(wǎng)安備32041102000483號 網(wǎng)站標(biāo)識碼:3204000002 蘇ICP備05003616號 Technical Support Phone:0519-85685023
      Best viewed in IE 6.0 browser with and above 1024*768 resolution.
      国产精品综合一区二区,国产在线精品一区二区不卡顿,亚洲中文制服丝袜欧美精品,人碰超碰免费 久久综合中文无码 国内中文字字幕在线中文无码

      <b id="w9hfh"><meter id="w9hfh"></meter></b>
      <dl id="w9hfh"></dl>
      1. <thead id="w9hfh"></thead>
        <b id="w9hfh"></b>
          <cite id="w9hfh"><table id="w9hfh"></table></cite>